Know where your EPC project actually stands.

Your whole EPC team enters its records in one system. Click any number on the dashboard to open the record behind it, with a name and a date on it.

  • Setup in 20 days
  • Training in 10
  • One-year bug-fix warranty
  • Built and supported in Jakarta
EPCIMA PMTDashboardDocumentsTechnical QueryPurchase OrderDataDemo Director
Progress & ExecutiveProject ControlEngineeringE-ProcurementConstructionCommissioningQA/QCHSEFinance

Progress & Executive

EPCIMA-ILL-01 · LNG Terminal & Regas · Illustrative

Week 69 · report issued
Schedule performance0.79Earned $36.2M vs planned $45.6M
Commercial operation+15daysForecast vs baseline 31 Dec 2025
S-Curve · Planned vs Actualdetails →
PlannedActualWeek 69
Budget Overviewdetails →
  • Commissioning$1.1M
  • Construction$32.7M
  • Engineering$10.0M
  • Procurement$32.6M

CommittedSpentTotal $76.4M

Milestones · Forecast vs Baselinedetails →
MilestoneBaselineForecastVar
Engineering 60% Complete31 Dec 202515 Jan 2026+15d
Civil Works Complete31 Mar 202615 Apr 2026+15d
Module 2A Erection Start30 Apr 202605 May 2026+5d
Purchase Order Pulse
10Active POs
7Overdue
$84.4MCommitted

Week 69 · progress by discipline

DisciplinePlannedActualVar
Engineering95.0%90.0%−5.0
Procurement72.0%66.0%−6.0
Construction45.0%24.0%−21.0
Commissioning3.0%0.0%−3.0

Click a discipline to see its packages.

Construction · Week 69 · by package

PackagePlannedActualVar
A00 · Jetty & Trestle57.86%29.99%−27.9
A10 · LNG Storage Tank48.0%31.5%−16.5
A20 · Regas Module 2A36.2%20.1%−16.1
A30 · Utilities & BOP28.0%12.4%−15.6

Click a package to open its record.

Level 4 · full record

WBS 3.1 · A00 Jetty & Trestle In progress
Planned, week 6957.86%
Actual, week 6929.99%

SPI 0.52 · behind plan. Schedule risk area.

WBS code
3.1
Discipline
Construction
Responsible
Construction Manager
Last updated
Week 69 · Friday 16:40
Notes
Piling 78% complete. Deck erection started W67, one crane instead of two.
Evidence
IMG_4471.jpgIMG_4472.jpgPiling-report-W69.pdf

Weekly progress

  • W69Actual 29.99% · Construction Manager
  • W68Actual 27.10% · Construction Manager
  • W67Actual 24.80% · Construction Manager

Illustrative demo data, not actual project figures.

Your team records the work as it happens.

Your team enters each lift, PO, inspection and NCR once, on site, with a name and a date. We put it on the dashboard that week.

Request to purchase order, on one record.

Engineering raises the request. Your buyers take it through budget, tender, sealed opening and award on the same record, and each approver signs and dates their step. Your vendor works their part from their own login.

See everything in E-Procurement See the Vendor Portal
MR-EPC-LNG-2026-0034Your team · E-Procurement
Status
Draft · sent for budget Budget approved Tender issued Bids opened · 2 of 2 keys Awarded · Vendor 03 LOA countersigned PO-EPC-LNG-0105 issued

Engineering attaches the budget line. Approvers sign here, with no email chain.

You set the approver for each value band once.

Your buyer invites vendors from the record. Vendors bid in their portal.

Bids stay sealed until two named people open them together.

You set who signs each award by value. Each signature carries a name and a time.

The vendor countersigns in their portal. You see the signed copy on this record.

Your buyer issues the PO from the same record. The PMT dashboard shows it that week.

Award approval chain · USD 100,000 – 500,000
  • PMProcurement managerApproved 09:12
  • PJProject managerApproved 10:40
  • SCSteering committeeNot required
Vendor 03 · E-Procurement Vendor PortalWaiting on you

0 items

  • Acknowledge PO-EPC-LNG-0105Confirm delivery datesToday
  • Kick-off meetingAccept or propose a new time2 days
  • Countersign letter of awardTND-EPC-LNG-2026-0017Today
  • Submit your bidSealed until opening7 days

Nothing waiting on you yet.

Each vendor signs in separately and sees only their own work.

Illustrative record. Names and figures are not from a real project.

Eight modules. One system.

Every module comes with its dashboard and registers in PMT Core, for every client. A Full Module adds what reaches outside PMT: a login for your vendors, subcontractors or client, or a link to your P6 schedule or your ERP. E-Procurement runs today; we scope the others per project. Open one to see the screens and the full feature list.

How fast can we set up your system?

  1. 20 days

    Setup

    We set it up from your contract. Your document register comes in from Excel, and we enter your other trackers with your team.

  2. 10 days

    Training

    We train your team on the live system, on site, entering real records.

  3. Day 31

    Live

    Dashboards go live. Each weekly and monthly report freezes its numbers at the cut-off and goes out as a locked PDF.

PMT Core · included for every client

Live on day 31, for your team

  • Module dashboards, L1 to L4, down to the source record
  • 29 registers, one entry each
  • Weekly and monthly reports, frozen at the cut-off and issued as PDF
  • Access by role, scoped per project

Full Module · scoped per project

For outside parties

  • Vendors and clients get their own login
  • They enter their own records
  • Approvals stay in the system
  • We flag late deliveries and expiring documents

E-Procurement and its vendor portal run today. For the other modules we design the portal with you and agree scope, timeline and price per project.

Works with what you already run.

  • Primavera P6 · MS ProjectYour planners keep the master schedule. A schedule link reads each update and maps it to your WBS, scoped per project.
  • Your accounting or ERPYour ERP stays the book of record. An ERP link reads actual cost per project and cost code, scoped per project.
  • Excel · PDFYour document register comes in from Excel at setup. When you ask, we hand your data back in full.
  • E-ProcurementProcurement progress lands on the executive screen with its source next to it: from E-Procurement, pulled 09:41.
Project team around a meeting table with laptops and printed registers.

We know EPC projects from the inside.

We ran EPC projects before we built the software.

  • We've run energy and industrial EPC projects
  • We've chased vendors and expedited POs ourselves
  • We built it around real project work, not a demo
  • Access by role, file downloads logged, your data handed back in full
  • We support you in English and Bahasa Indonesia

Your project data stays with you.

  • RolesAccess by role and by project
  • AuditEvery file open and download is logged
  • HostingManaged in Indonesia, or your server
  • Your dataHanded back in full when you ask
  • Per contractHosting location and backup schedule

Get invited to quote on EPC, shipping and LNG work.

Register once and pick the categories you supply. A buyer who opens a request in one of them can invite you, and you quote online against their quantities and due date.

At a glanceVN-01
Cost
Free to register and to quote
Time to register
About 15 minutes
Based abroad
Register with your own country's papers
First quote
On your first invitation, before your documents are checked

Questions we hear a lot

Does it replace Primavera, MS Project or our Excel trackers?

No. Planning stays in Primavera, MS Project or your existing tool. PMT holds the project records and tracks progress against the plan. It replaces the Excel trackers around your schedule.

How long does implementation take?

Twenty days of setup, then ten days of training on site. We configure it from your contract, bring your document register in from Excel, and enter your other trackers with your team.

How is it priced?

Pricing is per project, not per seat. The build includes a one-year bug-fix warranty. After that, a yearly care contract covers the rest of the project.

Where is it hosted and who owns the data?

We host it in Indonesia, or you run it on your own server. Your data stays yours, and we hand it back in full when you ask.

Can vendors and the client log in?

Vendors log in today, through the Vendor Portal of E-Procurement, and see only their own records. Vendors who want to join start at epcima.com/vendor-network. Logins for your client and your subcontractors are a Full Module we scope per project.

What do you need from our side?

We need one project-control contact, your WBS and phase weights, and your approval flow. We handle the rest.

Is it only for LNG and energy?

No. It works across EPC projects: modules, plants, terminals, marine works and fabrication yards.

Does it connect to our accounting system?

PMT Core keeps the project budget, commitments and invoices, for every client. Your ERP stays the ledger, and PMT never posts to it. An ERP link that reads actual cost per project and cost code is a Full Module: we agree the source, format and schedule with your finance team per project.

Can we see it on our own project structure before deciding?

Yes. Send us your WBS and we load it into a demo system before the walkthrough.

See it on your project.

A short walkthrough on your own project structure. Send us your WBS and we load it in before the call.

Request a demo by email WhatsApp

We reply within one working day.

Illustrative data. Names and figures are not from a real project.