Modules / QA/QC

QA/QC

Inspection and test plans, joint inspections with every party, NCRs from raised to closed, FAT and test records.

Used by QA/QC manager, inspectors, vendors, client inspectors, third-party inspectors, authorities

PMT Core · included for every clientFull Module · scoped per project

EPCIMA PMT QA/QC: QA/QC · overview.
QA/QC · overview

What it does

Quality is a register of what was inspected, what failed and what was done about it. We move every NCR through a fixed path with an owner at each step, and the executive screen shows how many are open today.

What the dashboard reads from it

  • Open NCRs
  • NCR close-out ratio
  • ITP completion %
  • FAT scheduled vs completed
  • Joint inspections this week and pending client witness

How the work flows

3 flows · 13 steps · 3 gates · 1 in the portal

Inspection

The ITP says what gets inspected. Every inspection is requested, done and answered in the register.

  1. ITP per systemQA/QC manager
  2. Inspection request (RFI)Contractor or vendor
  3. InspectionInspector, with location
  4. ResultAccept, reject, conditional
  5. NCR if rejectedQA/QC
  6. Close-outOwner at every stepgate

Vendor inspection

Inspection at the vendor's works is the same record, with the release note as the gate.

  1. Ready for inspectionVendor, in the portalportal
  2. Witness or reviewInspector
  3. Release noteQA/QC releases; nothing ships without itgate

Joint inspection

Request, invite, inspect, close. Each party in its own login.

  1. RequestContractor or vendor
  2. InviteQA/QC picks the parties
  3. InspectAttendance and result on the day
  4. CloseResult feeds the ITP; NCR if failedgate

Gate: cannot pass until recordedPortal: the outside party does this stepAutomatic: the system does it

Hatched steps belong to the Full Module, scoped per project. Click any step to see who does it.

Screens

EPCIMA PMT QA/QC: Inspection and test plan.
Inspection and test plan
EPCIMA PMT QA/QC: Inspection requests (RFI).
Inspection requests (RFI)

Real screens from the working product, with illustrative project data. Company and people names are replaced. Click a screen to enlarge.

Full Module · scoped per project

The owner, vendors and third-party inspectors receive inspection notices, record attendance, sign results and approve NCR dispositions in their own login. One weekly schedule shows every party where to be. The ITP holds the next activity until the party signs, and the dossier builds itself from signed records. We design this with you and build it for your project. Scope, timeline and price are agreed per project.

Design preview of Inspection and test plan, not a working screen.
Inspection and test plan · design preview
Design preview of Weekly inspection schedule, all parties, not a working screen.
Weekly inspection schedule, all parties · design preview
Design preview of Joint inspection notice and sign-off, not a working screen.
Joint inspection notice and sign-off · design preview
Design preview of NCR disposition, not a working screen.
NCR disposition · design preview
Design preview of QA dossier builder, not a working screen.
QA dossier builder · design preview

Decide on what runs today: the PMT Core screens above. Design previews show the intended scope. What we build, when, and at what price, we agree per project.

What is inside

17 capabilities in 4 groups

Plans and requests

  • Inspection and test plans per system with total and completed points
  • ITP completion % per systemautomatic
  • Inspection requests with type, location, due date and inspector
  • RFI status: issued, completed, overdue

Findings

  • Non-conformance reports by severity: critical, major, minor, observation
  • Open vs total NCR by severityautomatic
  • First-pass acceptance rateautomatic
  • Open NCR count on the executive screen, the day it is raisedautomatic

Vendor side

  • FAT register with schedule and result
  • Inspection release note gates every shipmentgatein E-Procurement
  • Vendor inspection and FAT on one schedule

Joint inspection, all parties

  • Inspection requests against an ITP item or a vendor milestonescoped per project
  • Participants: client, vendor, third party, authorityscoped per project
  • One schedule across companiesscoped per project
  • Attendance recorded per partyscoped per project
  • Result and evidence on the dayscoped per project
  • Result closes the ITP itemautomaticscoped per project

How it connects

RecordsStay in this module. Entered once, with an owner and a date.
DashboardsL1 to L3 read a snapshot of this module on a schedule and print where the number came from.
RolesOne identity across modules. Outside parties log in only where a Full Module runs.
Source on every panelEach number shows whether it came from the PMT register or a module feed.

See QA/QC on your project.

A short walkthrough on your own project structure. Send us your WBS and we load it in before the call.

Request a demo by email WhatsApp

We reply within one working day.