Modules / Commissioning

Commissioning

Systems, test records, mechanical completion and handover.

Used by Commissioning manager, system engineers, client, MIGAS and other authorities

EPCIMA PMT Commissioning screen.
Commissioning · overview

What it does

We run commissioning per system, not per drawing. Each system has its test records, its mechanical completion certificate and its punch list, and joint inspections put the client and the authorities on the same schedule.

What the dashboard reads from it

  • System completion %
  • ITRs by status
  • Open commissioning punch items
  • MC certificates submitted / approved

How the work flows

2 flows · 10 steps · 2 gates

System to handover

Every system walks the same path. The dashboard shows where each one stands.

  1. System registerCommissioning manager
  2. Pre-commissioningSystem engineer
  3. Mechanical completionCommissioning managergate
  4. Joint inspectionClient and authorities
  5. PLO (MIGAS)Applied, inspected, approved
  6. HandoverClient

Factory acceptance

FAT is recorded against the vendor and the equipment, and its result decides whether goods leave the works.

  1. ScheduleQA/QC and vendor
  2. WitnessInspector
  3. ResultPass, conditional, fail
  4. ReleaseFeeds E-Procurementgate

Gate: cannot pass until recordedPortal: the outside party does this stepAutomatic: the system does it

Screens

EPCIMA PMT Commissioning: System register.
System register
EPCIMA PMT Commissioning: Pre-commissioning activities.
Pre-commissioning activities
EPCIMA PMT Commissioning: FAT register.
FAT register

Screens from the working product. The project data is illustrative, and company and people names are replaced. Click a screen to enlarge.

What is inside

10 capabilities in 3 groups

Systems

  • System register with type, progress % and planned %
  • Mechanical completion status per system
  • PLO (MIGAS) status per system: not applied, applied, inspected, approved
  • System completion % on the dashboardautomatic

Tests

  • Pre-commissioning activities per system with completion %
  • FAT register: equipment, vendor, schedule, result
  • FAT pass / fail ratioautomatic

Punch and inspections

  • Punch list per category (A blocks start-up, B blocks performance test, C after handover)
  • Joint inspections with date and participants
  • Upcoming joint inspections on the dashboardautomatic

How it connects

RecordsStay in this module. Entered once, with an owner and a date.
DashboardsL1 to L3 read a snapshot of this module on a schedule and print where the number came from.
RolesOne identity across modules. Vendors and the client see only their own packages.
Source per projectManual register in PMT, or the module feed, chosen in Config per project.