Project Control

The WBS and weights from your contract, the schedule from your planners, the risk register, and the S-curves everything rolls up into.

Used by Project control manager, planners, project manager, risk owners, owner's representative

PMT Core · included for every clientFull Module · scoped per project

EPCIMA PMT Project Control: Project Control · overview.
Project Control · overview

What it does

Project control holds the structure every other module reports against: the WBS and its weights, the baseline and the weekly progress. Each report freezes its numbers at the cut-off date, and the issued PDF is locked by revision.

What the dashboard reads from it

  • Overall progress vs planned
  • SPI and earned value
  • Milestone forecasts vs baseline
  • Milestone variance
  • Top five risks and overdue mitigations

How the work flows

4 flows · 20 steps · 1 gate

The weekly cycle

Progress is typed or fed once a week. The report freezes its numbers at the cut-off date and is issued as a locked PDF.

  1. WBS and weightsFrom the contract, at setupconfigured
  2. Weekly progressPlanners, or a module feed
  3. Cut-offReport date set
  4. Roll-up L4 to L1Weightedautomatic
  5. Report issuedPDF locked by revision

Schedule update

Your planner exports the update from P6 or MS Project. We check it against the baseline before any number moves on the dashboard.

  1. Export the updatePlanner, from P6 or MS Project
  2. UploadPlanner
  3. Map and checkActivity code to WBS, changes vs last updategate
  4. CommitProject control manager
  5. Dashboards and look-aheadUpdated from the scheduleautomatic

Earned value

Three numbers, never merged: physical progress, money committed, money spent.

  1. Physical %From progressfeed
  2. Earned value% × contract valueautomatic
  3. Planned valueFrom the baselineautomatic
  4. Actual costFrom your ERPfeed
  5. SPI, then CPISPI today; CPI once actual cost comes from your ERPautomatic

Risk, start to close

Score it, own it, mitigate it by a date. The system escalates what you did not.

  1. IdentifyAnyone
  2. AssessProbability × impact, 1 to 5
  3. MitigateOwner and due date
  4. ReviewMonthly
  5. Auto-escalateScore rises when the mitigation is overdueautomatic

Gate: cannot pass until recordedPortal: the outside party does this stepAutomatic: the system does it

Hatched steps belong to the Full Module, scoped per project. Click any step to see who does it.

Screens

EPCIMA PMT Project Control: WBS and weights.
WBS and weights
EPCIMA PMT Project Control: Milestones, baseline vs forecast.
Milestones, baseline vs forecast
EPCIMA PMT Project Control: Risk register.
Risk register

Real screens from the working product, with illustrative project data. Company and people names are replaced. Click a screen to enlarge.

Full Module · scoped per project

Your planner uploads each P6 or MS Project update. We map activities to the WBS, show what moved against the baseline and the last update, and feed the S-curve plan line, milestone forecasts and the construction look-ahead. P6 or MS Project stays the master schedule. Owner variations and vendor change orders run on one change record, and the budget transfer keeps the original baseline. We design this with you and build it for your project. Scope, timeline and price are agreed per project.

Design preview of Schedule update from P6 or MS Project, not a working screen.
Schedule update from P6 or MS Project · design preview
Design preview of Change control, owner and vendor, not a working screen.
Change control, owner and vendor · design preview

Decide on what runs today: the PMT Core screens above. Design previews show the intended scope. What we build, when, and at what price, we agree per project.

What is inside

24 capabilities in 6 groups

Structure

  • WBS with level, parent, department and weight %
  • Source printed next to every number: manual entry or module feed

Progress

  • Weekly progress per WBS node, planned and actual cumulative
  • S-curves planned vs actual at L1, L2, L3automatic
  • Reports freeze at the cut-off; the issued PDF is locked by revision
  • Drill from L1 to the record that produced the number

Schedule and cost

  • Milestones with baseline, forecast, actual and critical-path flag
  • Milestone at-risk flag with LD exposureautomatic
  • Schedule variance in daysautomatic
  • SPI and earned valueautomatic
  • Penalty exposure by milestone: delay and performance

Schedule from P6 or MS Project

  • Reads P6 (XER or XML) and MS Project (XML) updates; your planners keep the master schedulescoped per project
  • Activities map to WBS through one activity codescoped per project
  • Baseline, forecast, float and critical path from each updatescoped per project
  • Planned % for the S-curve from the schedule updatescoped per project
  • Look-ahead for construction from the master schedulescoped per project

Issues

  • Top issues register with owner and due date

Risk

  • Risks with category, description, probability, impact and score
  • Status: open, mitigating, closed
  • Categories: procurement, engineering, construction, logistics, HSE, HR
  • Top five risks ranked by score on the dashboardautomatic
  • Overdue mitigation flagautomatic
  • Auto-escalation with the score history shownautomatic
  • Risks by category, open vs totalautomatic

How it connects

RecordsStay in this module. Entered once, with an owner and a date.
DashboardsL1 to L3 read a snapshot of this module on a schedule and print where the number came from.
RolesOne identity across modules. Outside parties log in only where a Full Module runs.
Source on every panelEach number shows whether it came from the PMT register or a module feed.

See Project Control on your project.

A short walkthrough on your own project structure. Send us your WBS and we load it in before the call.

Request a demo by email WhatsApp